Systemjämförelse – NH-90 och MH-60R
2014 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE credits
Student thesisAlternative title
System comparison – NH-90 and MH-60R (English)
Abstract [sv]
År 2001 beställde FMV 18st NH-90 helikoptrar från NHIndustries. Syftet med inköpet var att Försvarsmakten skulle få ett nytt medeltungt helikoptersystem, för mark-och sjöoperativ uppgift. Försvarsmakten köpte in 5 st sjöoperativa och 13 st markoperativa helikoptrar. Den sjöoperativa helikoptern skulle ersätta helikopter 4 som skulle utgå vid 2011. Helikopter 14 systemet skulle vara färdiglevererat vid 2011, men på grund av förseningar så beräknas systemet vara färdiglevererat först vid år 2019.
I detta arbete har därför en systemanalys genomförts för att se vilket helikoptersystem som Försvarsmakten potentiellt hade tjänat på att köpa, utvecklingsprojektet helikopter 14, eller ett Commercial off the shelf köp i form av det amerikanska, MH-60R Seahawk. Arbetet har undersökt vilket system som på pappret är mest lämpat för att lösa ubåtsjakt med svenska förutsättning. Men även yttre faktorer har belysts såsom upphandlingsmetoder, politiska fördelar och nackdelar med upphandlingen och försvarssamarbeten.
Resultatet av systemanalysen visade att helikopter 14B var prestandamässigt det bästa systemet, däremot var systemen väldigt snarlika i prestanda och därför så bör fler aspekter tas med i beräkningen inför upphandlingen av nästa helikoptersystem, såsom inköpsmodeller, försvarssamarbeten och livstidsförlänga äldre system.
Abstract [en]
In 2001 Swedish FMV ordered 18 NH-90 medium heavy helicopters from NH industries. The purpose of the procurement was that the new helicopter 14 would become the Swedish armed forces new primary medium helicopter, able to solve both ground and naval missions. The deal consisted of 5 naval versions of helicopter 14 and 13 helicopters for ground operations. The naval version of helicopter 14 was supposed to replace the Swedish helicopter 4, which was decommissioned 2011. Helicopter 14 was planned to be delivered at 2011, but because of delays it is now predicted to be delivered at 2019.
Therefore in this assignment a system analysis has been conducted to determine which helicopter system the Swedish armed forces in theory would have profited most to procure. Helicopter 14 system, or the American commercial off the shelf solution, MH-60R Seahawk. The assignment has be conducted to conclude which of these two system solutions would be the most optimal for preforming anti-submarine warfare under Swedish conditions. But also external factors in the procurement will be examined such as procurement methods, political effects, both positive and negative and also aspects of multinational cooperation’s.
The results of the system analysis showed that helicopter 14 was the best system for the Swedish armed forces. However there was few decisive differences between the two systems, therefor more factors should be taken into account during the procurement of a new helicopter system, such as procurement methods, defense cooperation’s and extending the lifetime of the previous system.
Place, publisher, year, edition, pages
2014. , p. 46
Keywords [en]
System analysis, naval helicopter, anti-submarine warfare, helicopter 4, helicopter 14, Seahawk.
Keywords [sv]
System analys, sjöoperativ helikopter, ubåtsjakt, helikopter 4, helikopter 14, Seahawk.
National Category
Aerospace Engineering
Identifiers
URN: urn:nbn:se:fhs:diva-4710OAI: oai:DiVA.org:fhs-4710DiVA, id: diva2:728581
Subject / course
Militärteknik, självständigt arbete
Educational program
Officersprogrammet (OP)
Supervisors
Examiners
2014-06-252014-06-242014-06-25Bibliographically approved